Update from Energy Transfer – March 21, 2025:

Energy Transfer remains committed to the cleanup and restoration of the Mt. Eyre neighborhood and has made notable progress over the last several weeks. The pipeline is operating safely. As we continue to investigate previously repaired locations along the pipeline, under the Pipeline and Hazardous Materials Safety Administration’s (PHMSA’s) oversight, to date we have found Update from Energy Transfer – March 21, 2025:

Update from Energy Transfer – February 17, 2025

Energy Transfer has published our full presentation from the public meeting this past Thursday, Feb. 13, on our incident website. Additionally, we have populated a list of frequently asked questions (FAQs) on the website, which we will continually update to address ongoing questions, and to share more information as it is available. The next public meeting is scheduled on Thursday, Update from Energy Transfer – February 17, 2025

Update from Energy Transfer – February 11, 2025

As of 4 p.m. on Tuesday, Feb. 11, our third-party environmental consultants have performed 114 water tests in the neighborhood and have received results for 70 of those. Of the 70 tested, 6 have hydrocarbons present above statewide health standards. We have 108 additional water tests scheduled (or in the process of being scheduled). We are making an effort to accelerate this process as much Update from Energy Transfer – February 11, 2025

Update from Energy Transfer – February 10, 2025

As of 4 p.m. on Monday, Feb. 10, our approved independent consultants have inspected 108 water wells in the neighborhood and have received results for 57 of those. Of the 57 sampled, 6 have hydrocarbons present. We have 68 additional water wells scheduled (or in the process of being scheduled) to be inspected. We are making an effort to accelerate this process as much Update from Energy Transfer – February 10, 2025